Fan Favorite

Bathroom remodels finished to a spa-level standard.

Frameless glass, full-slab tile, freestanding tubs, and fixtures that hold up. We plan the layout, coordinate every trade, and build the finished bathroom start to finish.

Service Overview

What a Kazemi bathroom remodel includes

Bathrooms are small rooms with a lot going on: waterproofing, plumbing, ventilation, electrical, and finish materials that all have to work together. We coordinate every trade so the finished room is watertight, code-compliant, and built the way you pictured it.

From a guest bath refresh to a primary suite gut renovation with a curbless shower and freestanding tub, the approach is the same: get the waterproofing and layout right first, then build the finishes around it. We've done both the quiet, functional updates and the full onyx-tile, brushed-gold showcase bathrooms, and every one gets the same attention to detail.

What's Included

Everything covered under one contract

Showers & tubs

Frameless glass enclosures, curbless showers, and freestanding or built-in tubs.

Tile & waterproofing

Full-slab or mosaic tile over a properly waterproofed substrate, floor to ceiling.

Vanities & storage

Custom or semi-custom vanities sized to the room, with storage that actually gets used.

Lighting & ventilation

Vanity lighting, recessed cans, and properly sized exhaust fans to keep moisture in check.

Fixtures & plumbing

Faucets, shower systems, and rough-in plumbing, matched in a finish you'll want to live with.

Permits & inspections

We pull the permits, schedule the inspections, and handle the paperwork so you don't have to.

Our Process

How a bathroom remodel actually goes

Six steps, one team watching all of them.

01

Consultation

We walk the space, talk through what's not working, and get a feel for your budget and timeline.

02

Design & planning

Layout, tile, and fixture selections come together into a plan you approve before demo starts.

03

Estimate

A detailed, line-item estimate so you know exactly what you're paying for.

04

Preparation

Permits pulled, tile and fixtures ordered, and a schedule set before anything gets torn out.

05

Construction

Demo, plumbing and electrical rough-in, waterproofing, tile, and fixture installation, inspected at each stage.

06

Final walkthrough

A punch list, a full clean, and a walkthrough together before we call it done.

Good to Know

Details worth knowing before you call

Typical timeline3 to 6 weeks for most full bathroom remodels, depending on tile lead times and scope.
Living at homeYes, especially if it's not your only bathroom. We'll sequence work to minimize the disruption.
PermitsPlumbing and electrical changes typically require permits. We handle that process for you.
WaterproofingEvery wet area gets a proper waterproof membrane before tile goes down, no exceptions.
Pricing

What a bathroom remodel typically costs

Every bathroom is different. These are typical ranges to help you plan, not a quote, use them as a starting point for the conversation.

Refresh

$12,000–$22,000
Fixtures, vanity & finishes, layout unchanged
  • New vanity & fixtures
  • Reglazed or replaced tub
  • Updated lighting
  • Fresh paint & hardware
Get a Free Estimate

Primary Suite / Showcase

$60,000+
Layout changes, premium stone & fixtures, curbless shower
  • Freestanding soaking tub
  • Full-height natural stone or onyx
  • Curbless, zero-threshold shower
  • Radiant floor heating option
Get a Free Estimate
These are estimated ranges, not a quote. Final pricing depends on square footage, tile and stone selection, fixture package, and whether the layout or plumbing locations change. The biggest factors are tile material, shower configuration, and vanity size. We'll give you a firm, line-item number after the in-home consultation.
3–6
Weeks, typical full remodel
1
Point of contact, start to finish
3
Pricing tiers to plan around
100%
Waterproofed before tile goes down
Why Choose Us

What working with Kazemi actually looks like

Licensed & insured

Every bathroom we build is permitted, inspected, and covered, especially the waterproofing.

One crew, start to finish

The same team that sits down with you at the consultation is on site through the final walkthrough.

Honest timelines

We build the schedule up front and tell you immediately if anything shifts.

Related Services

Often paired with a bathroom remodel

Common Questions

Bathroom remodeling FAQ

Most full bathroom remodels in our service area run $28,000 to $55,000, with lighter refreshes starting around $12,000 and primary-suite showcase bathrooms running $60,000 and up. Tile material, shower configuration, and vanity size are the biggest cost drivers. See the pricing section above, and we'll give you a firm number after an in-home consultation.
A typical full bathroom remodel takes 3 to 6 weeks from demo to final walkthrough. Custom tile and stone often have their own lead times, which we build into the schedule up front.
Most bathroom remodels that touch plumbing, electrical, or ventilation require permits. We handle pulling permits and scheduling inspections as part of the project.
Yes, most clients stay home during a bathroom remodel. If it's your only bathroom, we'll talk through a plan for that stretch of the project so it's as painless as possible.
We handle layout, tile, and fixture selection in-house as part of the design and planning phase. If you already have a designer or specific plans, we're glad to build from those instead.
Yes. If you've already bought tile, a vanity, or fixtures, bring them to the consultation and we'll build the layout and rough-ins around those dimensions and specs.

Ready to talk about your bathroom?

Tell us about your space and we'll follow up to schedule a free, no-pressure walkthrough.